In 2017, wildfire destroyed many of the structures and over 700 trees at Enchanted Hills Camp, which has been serving blind children, youth, adults and their families in Napa since 1950. Overall, 20 structures, almost half of the buildings, were destroyed. The Enchanted Hills team engaged in a rebuilding process with full  ADA accessibility and blind design in mind. The…

The new San Rafael High School aquatics center and gymnasium renovation project includes a new pool, multi-use studio, sports medicine classroom, two team rooms, restrooms, and outdoor exercise area. The gymnasium modernization project addresses all areas including three gymnasiums, locker rooms, team rooms, fitness studio, classrooms, offices, laundry and uniform storage, and weight training spaces.  The project also includes HVAC…

Terra Linda High School will soon welcome swimmers to a new 40M competition swimming pool, flanked by a grandstand viewing area and support buildings including equipment storage and mechanical/electrical spaces. Older, existing facilities will be replaced with new program areas for a weight room, dance/cheerleading, and wrestling, a booster room, restrooms, exterior showers, exterior lockers, and new exterior graphic panels…

Breaking Ground in the Spring of 2024, the new, Montgomery High School classroom building will be a striking 26,852 SF, 2-story structure. The new building will replace 17 aging relocatable classrooms on the 60-year-old site. The project includes a new covered walkway and all associated site work. on an existing campus. The building will be bookended by reddish-orange porcelain panels…

During the Summer of 2024, Wright Contracting is updating Analy High School's old boiler system with classroom HVAC units in the main building, theater and choir classrooms and will also be performing associated upgrades to support the new system.

This project involved a complete renovation of the interior of the beloved, 80 year old, 400-seat Luther Burbank Auditorium, with improved sight lines and full ADA access. Improvements to back-of-house production spaces included a renovated prop shop and full costume production facility, in addition to two new classrooms. The project included a new “Studio Theater,” a multi-function flexible space that…

Wright Contracting partnered with TLCD and ELS Architectural firms to design and build a new athletics complex on the Santa Rosa Junior College campus, including baseball, softball and soccer fields, a 52 meter race and diving pool, associated out buildings, stadium bleachers with press box, a new football/track fieldhouse, including locker rooms, showers and restrooms, a classroom/team room, coaches offices,…

The new 450-seat, 18,000 SF Center for the Arts theater building has two seating levels, gallery space, classroom/greenroom spaces, dressing rooms and a gala entry hall. The state-of-the-art venue supports district-wide arts programs, as well as Novato High School’s Marin School for the Arts. A new 15,000 SF Center for the Sciences building is home to the school’s chemistry, biology,…

In June of 2020, we broke ground on the new 24,000 sq.ft. two-story classroom building, on the Cardinal Newman High School campus. This project consisted of construction of 3 new buildings, including the 2-story wood framed classroom building, with steel framed mezzanine and stairs with concrete and stucco exterior. The two-story complex eliminates the need for existing temporary portable learning…

The Jefferson Elementary Classroom project included construction of a new 18,900 square foot 2-story classroom building. The new building contains 12 classrooms and 2 breakout rooms for teachers who want the option of taking groups Additional work includes creation of new storm drainage and bio retention facilities, resurfacing of the existing asphalt pavement, new landscaping and a new play structure.…