This design-build project was developed with a team that includes TLCD Architecture and Meehleis Modular Buildings. The project involved constructing buildings totaling 25,000 square feet, which will serve as swing space while the junior college's new STEM building is constructed and will later become permanent instructional space, administration offices, and faculty offices. There was a tight time table for the…

We're excited to be part of the TLC Pavilion project, an exciting addition to the organization's campus in Sebastopol. The space will be used for dining, events, and gathering together. Overall the Farm to Table project includes an organic farm, a teaching kitchen, a chicken coop, and a goat run. The goal is to establish an educational environment that engages…

Wright Contracting recently modernized HVAC and roofing systems at Brook Hill Elementary School, as well as the DeSoto Hall building on the Santa Rosa High School Campus and the South Gym and ArtQuest buildings, also on the Santa Rosa High School campus. The work involved removing existing roofing and associated components, which were then replaced with new, as well as…

As one of the top private high schools in the Napa Valley, Justin Siena prides itself on students that excel in both academics & athletics. Wright Contracting was brought in to help revitalize the existing student locker room and transform it into a state of the art training facility. The new locker room consists of team rooms for high-tech game…

The Cloverdale Unified School District Washington School Gymnasium project includes construction of a new 13,500 square foot gymnasium. The gymnasium will feature hardwood flooring and markings to accommodate high school and middle school-sized basketball courts, practice and regulation-sized volleyball courts, as well as badminton. There will be retractable bleachers and a gymnasium divider screen within the gymnasium as well. The…

Marin Academy Science and Innovation Center is situated on a steep slope in the center of an occupied school campus. The 18,000 square foot, three story center is a 21st Century learning environment that makes the sciences a visible, vibrant, and integral part of the campus. The building includes six lab classrooms and an independent study lab to support the…

The construction of the new DeAnza High School campus took place on an operational site while the existing campus remained open. Upon completion of the new campus, the old campus structure was demolished in order to make space for a future building and sports fields. DeAnza High School encompasses 33 acres and consists of nine new buildings, totaling 190,000 SF.…

The Cloverdale High School John L. Allen Memorial Field Project included replacement of a dirt track with an all-weather 7-lane track and field event venue for discus/shot put, side by side triple jump and long jump, and high jump and replacement of a grass field with a synthetic turf athletic field for football and soccer. The project also included an…

The St. Helena High School performing arts center was designed to match the style and exterior facades of the existing campus buildings, allowing it to easily blend into the beautiful and tranquil campus setting. The 20,861 square foot facility features state-of-the-art lighting, sound and acoustical systems to support a 350-seat theater, band room, scene shop, restrooms, box office, lobby gathering…

The Novato USD Sinaloa Middle School project includes modernization and renovation of 5 of the existing campus buildings as well as site work, including an outdoor plaza and student seating, accessibility upgrades, and emergency vehicle access upgrades. Renovations to the existing buildings include exterior finish replacement, fire alarm and PA system upgrades, restroom upgrades and improved accessibility. The Multipurpose Room…

Popular Posts

Recent Posts