The newest residence hall on campus, Edgehill Village opened in 2002. It takes its name from an old campus mansion that once served as the seniors' dormitory. The Village is a living/learning community with six buildings clustered together on the northeast corner of campus. Each building has eight two-bedroom apartments with two students per room. It has been designated as…

The 9,712 square feet Evergreen Elementary School modernization and new multi-purpose building project includes remodeling the existing multi-purpose building into a library and constructing a new multi-purpose building. The project also includes a substantial amount of site work, such as reconstructing the asphalt playground, creating a new parking lot at the Northwest corner of the site, and all of the…

Wright Contracting has been working with the Culinary Institute of America (CIA) to build culinary learning and exploration destinations since 2003. Projects we have done with the CIA include: A new demonstration theater kitchen and a new teaching kitchen used for filming and live demonstrations at Copia in Napa. The is a state-of-the-art 8,000 SF remodel of a former gallery…

The Richard Crane Elementary School  Modernization project consisted of a 30,000 square foot remodel and the addition of 7,200 square feet of new modular buildings. The first increment included the remodel of the existing administration and library buildings. The administration building got a facelift with new storefront windows and doors; new finishes; improved electrical and low voltage systems; updated instructional…

Thomas Page Academy underwent site improvements in order to give the campus a modern look. The addition of two new classroom buildings allows for growth in student numbers and a comfortable learning environment. Other improvements included new roofs, HVAC equipment, entry canopies, playgrounds and play structures, landscaping, lighting, painting and flooring.

New state-of-the-art Science Building constructed within an existing operational school campus. This building contains separate classroom facilities for Life Science, Earth Science, and General Science and the classrooms can be reconfigured into an event space.

The new 3 story steel framed College Academic Center is LEED Gold v3 Certified including geothermal, recycled content, products and labor sourced locally, and Forest Stewardship Council (FSC) wood. BIM was used for Mechanical / Electrical / Plumbing design. The project required extensive sitework and drilled piers and the building totals 38,000 SF.

This new, replacement high school football stadium project was built as a Collaborative for High Performing Schools (CHPS) program and includes Solar PV, Recycled Content Building Materials, High Efficiency Plumbing Fixtures and Reclaimed Materials.

The Mendocino College Lake Center brings a modern take on educational facilities to the area of Lake County. The 15,000 SF satellite campus includes three buildings with classrooms and administration offices. Board-formed concrete walls are lined with large windows that offer views of the surrounding hills. As a result of the large windows and tall ceilings, an abundance of natural…

This multi-phased project included demolition and sequenced construction of a new gymnasium, office, library, play structures, and extensive site renovations.  Challenges included working in a fully operational elementary school with a very tight construction schedule.

Popular Posts

Recent Posts